
Pontd554a9eb…34cc
Pfingstbergtunnel
Mannheim's Subterranean Giant
Votre visite compte pour ces réussites :
Mannheim: Premiers pas10 pts
Mannheim: Explorateur25 pts
Mannheim: Initié50 pts
The Pfingstbergtunnel extends for an impressive 5360 meters beneath Mannheim's Pfingstberg district. It is part of the high-speed railway connecting Mannheim and Stuttgart, opened in 1987. Operated by DB InfraGO, this tunnel is a significant feat of railway engineering.
Audioguide
English
0:000:45
Le saviez-vous ?
The tunnel was opened on May 31, 1987.
En bref
- Fondation
- October 1985
- Date d’ouverture
- May 31, 1987
Localisation
À proximité

St. Antonius
684 m de distance

Ehemalige Rheinau-Kaserne
998 m de distance

Hirschacker und Dossenwald
1.4 km de distance

Versöhnungskirche
1.1 km de distance

St. Johannes
1.1 km de distance

Amprion Station Rheinau
1.6 km de distance

Wasserturm (Mülheimer Straße)
1.0 km de distance

Backofen-Riedwiesen
2.6 km de distance
Crédits photographiques
- Pfingstbergtunnel (image d’en-tête): © Hubert Berberich (HubiB) (CC BY 4.0) · Wikimedia Commons
- St. Antonius: © Frank (CC BY-SA 3.0) · Wikimedia Commons
- Ehemalige Rheinau-Kaserne: © Dominik Lott (Dolo280) (CC BY-SA 2.5) · Wikimedia Commons
- Hirschacker und Dossenwald: Photo : AnRo0002 (CC0) · Wikimedia Commons
- Versöhnungskirche: © Frank (CC BY-SA 3.0) · Wikimedia Commons
- St. Johannes: © Frank (CC BY-SA 3.0) · Wikimedia Commons
- Amprion Station Rheinau: © 4028mdk09 (CC BY-SA 3.0) · Wikimedia Commons
- Backofen-Riedwiesen: © Telford (CC BY-SA 3.0) · Wikimedia Commons

