Skip to content
Bohrkopf T.R.U.D.E.
Monument6c320573…9618

Bohrkopf T.R.U.D.E.

Engineering Marvel Beneath the Elbe

Counts toward these achievements:
Hamburg: First Steps10 pts
Hamburg: Explorer25 pts
Hamburg: Insider50 pts
Sign up free →
The cutterhead T.R.U.D.E. commemorates the construction of the fourth Elbe tunnel tube, drilled between 1997 and 2000 beneath the riverbed. With a diameter of 14.20 meters, T.R.U.D.E. was the largest tunnel boring machine of its time.

Gallery

Be the first to check in here

Did you know?

The machine weighed over 2,000 tons.

Quick Facts

Wheelchair Access
Partially accessible

Guided Story

You're looking at the remarkable cutterhead T.R.U.D.E., a technical monument commemorating the massive engineering feat of constructing the fourth Elbe tunnel tube. Between 1997 and 2000, this behemoth worked beneath the riverbed. With a diameter of 14.20 meters, T.R.U.D.E. was the largest tunnel boring machine of its time. It moved over 400,000 cubic meters of sand, gravel, and stones, weighing in at over 2000 tons. If you turn around, you'll spot nearby landmarks like the MW 12 Emil road roller and the Museum of Work, both echoing Hamburg's rich industrial heritage.

Location

Explore all 1247 places in Hamburg →

Nearby

Evidence and review:
Authorship:
Authorship unavailable
Publication approval:
Approval provenance unavailable
Editorial review:
Not reviewed