Bohrkopf T.R.U.D.E.
Engineering Marvel Beneath the Elbe
Counts toward these achievements:
Hamburg: First Steps10 pts
Hamburg: Explorer25 pts
Hamburg: Insider50 pts
The cutterhead T.R.U.D.E. commemorates the construction of the fourth Elbe tunnel tube, drilled between 1997 and 2000 beneath the riverbed. With a diameter of 14.20 meters, T.R.U.D.E. was the largest tunnel boring machine of its time.
Gallery
Be the first to check in here
Did you know?
The machine weighed over 2,000 tons.
Quick Facts
- Wheelchair Access
- Partially accessible
Guided Story
You're looking at the remarkable cutterhead T.R.U.D.E., a technical monument commemorating the massive engineering feat of constructing the fourth Elbe tunnel tube. Between 1997 and 2000, this behemoth worked beneath the riverbed. With a diameter of 14.20 meters, T.R.U.D.E. was the largest tunnel boring machine of its time. It moved over 400,000 cubic meters of sand, gravel, and stones, weighing in at over 2000 tons. If you turn around, you'll spot nearby landmarks like the MW 12 Emil road roller and the Museum of Work, both echoing Hamburg's rich industrial heritage.
Location
Nearby

Museum of Work
146 m away

Zinnschmelze
114 m away

Straßenwalze MW 12 Emil
84 m away

Ausstellung am Turmbunker
198 m away

Seilbagger
157 m away

Geschichtswerkstatt Barmbek
278 m away

Schleidenbrücke
705 m away

Neuapostolische Kirche (Schwalbenstraße)
486 m away
Evidence and review:
- Authorship:
- Authorship unavailable
- Publication approval:
- Approval provenance unavailable
- Editorial review:
- Not reviewed