
Monument6c320573…9618
Bohrkopf T.R.U.D.E.
Engineering Marvel Beneath the Elbe
Checking in counts toward these achievements:
Hamburg: First Steps10 pts
Hamburg: Explorer25 pts
Hamburg: Insider50 pts
The cutterhead T.R.U.D.E. commemorates the construction of the fourth Elbe tunnel tube, drilled between 1997 and 2000 beneath the riverbed. With a diameter of 14.20 meters, T.R.U.D.E. was the largest tunnel boring machine of its time.
Audio Guide
0:000:45
Did you know?
The machine weighed over 2,000 tons.
Gallery
Location
Nearby
Image credits
- Bohrkopf T.R.U.D.E. (header image): © Wolfgang Meinhart (CC BY-SA 3.0) · Wikimedia Commons
- Museum of Work: © NordNordWest (CC BY-SA 3.0 DE) · Wikimedia Commons
- Zinnschmelze: © Dirtsc (CC BY-SA 3.0) · Wikimedia Commons
- Straßenwalze MW 12 Emil: © Claus-Joachim Dickow (CC BY-SA 3.0) · Wikimedia Commons
- Hufnerstraßenbrücke: © Bild: © Ajepbah / Wikimedia Commons (CC BY-SA 3.0 DE) · Wikimedia Commons
- Ausstellung am Turmbunker: © Uwe Rohwedder (CC BY-SA 4.0) · Wikimedia Commons
- Seilbagger: © Dirtsc (CC BY-SA 3.0) · Wikimedia Commons
- Geschichtswerkstatt Barmbek: © Uwe Rohwedder (CC BY-SA 4.0) · Wikimedia Commons
- Bramfelder Brücke: © Bild: © Ajepbah / Wikimedia Commons (CC BY-SA 3.0 DE) · Wikimedia Commons







