
Bridge844d51ad…ac51
Mainzer Autobahntunnel
Connecting Mainz's Hechtsheim District
Counts toward these achievements:
Mainz: First Steps10 pts
Mainz: Explorer25 pts
Mainz: Insider50 pts
The Mainzer Autobahntunnel is a crucial part of the A60 motorway ring in Mainz, featuring two tubes with three lanes each. Constructed between 2006 and 2012, it opened on August 10, 2012. Its modern design efficiently manages traffic flow in the Hechtsheim district.
Be the first to check in here
Did you know?
The tunnel's construction took six years.
Quick Facts
- Founded
- July 2012
- Opening Date
- August 10, 2012
Evidence and review
- Authorship
- Authorship unavailable
- Publication approval
- Approval provenance unavailable
- Editorial review
- Not reviewed
Guided Story
Standing here, you're right above the Mainzer Autobahntunnel, opened on August 10, 2012. It features two tubes, each with three lanes, efficiently channeling the A60 motorway traffic. Constructed between 2006 and 2012, the tunnel reflects modern engineering designed to meet the demands of increasing traffic. If you look to the north, the Academy of Sciences and Literature is about 427 meters away. This tunnel is a crucial part of the Hechtsheim district, silently supporting the flow of city life beneath your feet. It's an impressive feat of infrastructure, essential for keeping Mainz connected and moving smoothly.
Part of These Trails
Post-War Mainz — Walk IIStop 1 of 6
Location
Nearby

Akademie der Wissenschaften und der Literatur | Mainz
427 m away

Landesamt für Geologie und Bergbau
259 m away

Alte Ziegelei
1.4 km away

Stadtverwaltung Mainz, Ortsverwaltung-Mainz-Hechtsheim
1.6 km away

St. Pankratius
1.5 km away

Thomaskirche
653 m away

Jüdischer Friedhof Mainz-Hechtsheim
1.7 km away

Großbergpark
1.4 km away